npm.io
5.21.3 • Published 2d ago

@amcharts/amcharts5

Licence
SEE LICENSE IN LICENSE
Version
5.21.3
Deps
25
Size
26.0 MB
Vulns
0
Weekly
0
Stars
448

amCharts 5

npm version npm downloads

JavaScript and TypeScript charts and maps for the web: line, column, area and candlestick charts, pies and funnels, geographic maps, stock charts, Gantt charts, treemaps and other hierarchies, Sankey and chord diagrams, radars and gauges, timelines, word clouds and Venn diagrams.

Stock chart with volume and a toolbar Globe with satellite imagery Sunburst Sankey diagram Gantt chart Pixel map Gauge with colored bands Stacked column chart

Each picture links to its example's code. About 80 examples come with the library, and there are many more demos on the website.

This repository is the source code. To use amCharts 5 in a project, install the npm package or load it with script tags, as below.

Demos | Examples | Documentation | Class reference | Changelog | Download

Highlights

  • Interactive: zooming and panning, scrollbars, cursors, tooltips, legends, dragging and animations.
  • Canvas or SVG: charts are drawn on canvas, or as SVG with renderer: am5.SVGRenderer. am5.renderToSVG(root) returns a chart as SVG markup.
  • Charts from JSON: a chart can be described as a JSON config and built from it in code or by an <am5-chart> element, and a running chart can be saved as one.
  • Maps: globes and flat maps (six projections built in, and any other d3-geo projection can be added), satellite images with day and night, pixel maps, lines and flows between places, and map files for the world, continents, countries and their regions.
  • Stock charts: over 30 indicators, drawing tools, comparing stocks, period selectors, and data grouping for large data sets.
  • Export: images, PDF, data and printing: PNG, JPG, SVG, PDF, CSV, XLSX, JSON and HTML.
  • Themes: 30 of them, among them dark, colorblind-friendly and responsive ones.
  • Accessibility: keyboard navigation and screen reader support.
  • TypeScript: the library is written in it, and the type definitions come with the package.
  • AI coding agents: the npm package includes AGENTS.md and a reference for every chart type, so that agents write code for the current API.

Install

With npm, for a project that uses a bundler:

npm install @amcharts/amcharts5

With script tags, from the CDN or from the files in the zip download:

<script src="https://cdn.amcharts.com/lib/5/index.js"></script>
<script src="https://cdn.amcharts.com/lib/5/xy.js"></script>
<script src="https://cdn.amcharts.com/lib/5/themes/Animated.js"></script>

Maps need map files (geodata), which are a separate package: npm, GitHub.

A first chart

The page needs an element with a height:

<div id="chartdiv" style="width: 100%; height: 500px;"></div>
import * as am5 from "@amcharts/amcharts5";
import * as am5xy from "@amcharts/amcharts5/xy";
import am5themes_Animated from "@amcharts/amcharts5/themes/Animated";

const root = am5.Root.new("chartdiv");

root.setThemes([
  am5themes_Animated.new(root)
]);

const chart = root.container.children.push(am5xy.XYChart.new(root, {}));

const xAxis = chart.xAxes.push(am5xy.CategoryAxis.new(root, {
  categoryField: "country",
  renderer: am5xy.AxisRendererX.new(root, {})
}));

const yAxis = chart.yAxes.push(am5xy.ValueAxis.new(root, {
  renderer: am5xy.AxisRendererY.new(root, {})
}));

const series = chart.series.push(am5xy.ColumnSeries.new(root, {
  xAxis: xAxis,
  yAxis: yAxis,
  categoryXField: "country",
  valueYField: "visits"
}));

const data = [
  { country: "France", visits: 1114 },
  { country: "Germany", visits: 1322 },
  { country: "Spain", visits: 711 },
  { country: "Italy", visits: 984 }
];

xAxis.data.setAll(data);
series.data.setAll(data);

With script tags the code is the same without the three import lines: each file makes its module a global of the same name (am5, am5xy, am5themes_Animated).

In a component (React, Angular, Vue), create the chart when the component is mounted and call root.dispose() when it is removed. There are guides for React, Angular, Vue, Next.js and others.

The package README has the list of chart types and their modules, where the examples are, charts from JSON, SVG, and how to use amCharts with AI coding agents.

What is in this repository

Folder What it is
src/ The library, in TypeScript
examples/shared/ The bundled examples, one folder each
examples/thumbs/ A picture of each example
packages/shared/ What ships beside the code: README, changelog, license
packages/library/ AGENTS.md and docs/, for AI coding agents
packages/script/ START-HERE.html, the first page of the zip download
build/ The build

Building from source

yarn install
Command Builds
yarn build The ES modules that go to npm, into dist/es2015
yarn build:script The script files that go to the zip and the CDN, into dist/script
yarn examples The examples, into both of the above. Run it after yarn build:script, then open dist/script/examples/index.html
yarn build:geodata The map files

npm works too (npm install, npm run build), but only yarn installs the exact versions in yarn.lock.

License

If you have a commercial amCharts 5 license, this software is covered by your license, which supersedes any other license bundled with this package.

If you don't have a commercial license, the use of this software is covered by a freeware license. See the included LICENSE file.

In short: the free license allows use in any project, commercial ones included, as long as the amCharts logo stays on the charts and the LICENSE file stays with the files. It does not allow selling the library or distributing it on its own. The LICENSE file has the exact terms, and commercial licenses cover what it does not.

Support, bugs and contributing

Keywords